Home renovations across Northern Tasmania
Kitchens, bathrooms and whole-house work, sequenced so you keep living in it wherever that can be done.
A renovation is mostly a sequencing problem. The demolition is a day. The six weeks after it are trades arriving in the right order, and that is the part we run.
Older Tasmanian houses hide things — stumps, wiring, a wall doing more work than it looks like. We open up early and price the surprise before it becomes an argument.
Kitchens and bathrooms are where a renovation gets judged, so they get the detailing time. Tiling falls, cabinet reveals, and the join where new work meets a very old wall.
Kitchen and bathroom renovations
Kitchens and bathrooms carry most of the trades in a renovation. Plumbing, wiring, waterproofing, tiling and cabinetry all have to land in order.
A bathroom’s waterproofing goes on before the tiles, and nobody sees it again. It is the part of the job most worth doing properly.
Where you can keep using the house, the work is sequenced around you. Where you cannot, you know before demolition day.
Renovating an older Tasmanian house
Weatherboard on stumps, old wiring and lath-and-plaster walls are common in older houses here. Each one changes the job once it is opened up.
A house built before 1990 can have asbestos in the eaves, the wet-area linings or under the floor coverings. It should be tested before anything is cut.
More than ten square metres of it has to come out with a licensed removalist. That cost belongs in the quote, not in a variation.
Heritage & period restorationWarmer and drier while the walls are open
Many older houses here have little or no insulation in the walls. Once a wall is opened for a renovation, filling it costs little extra.
Draughts come from old windows, floorboards and the gaps around fireplaces. Sealing them is often the cheapest warmth a renovation can add.
A Tasmanian winter finds every gap, so this gets settled before the linings go back on.
Home extensionsOther work we do
Where we do it
Renovation questions
Can we live in the house during a renovation?
Often, yes. Working one room at a time usually leaves the house liveable. Losing the kitchen is harder, and that part is planned with you before it starts.
What pushes a renovation over budget?
What is behind the walls. Stumps, wiring, water damage and asbestos only show once things are opened up. We open up early and price what we find.
Do I need approval to renovate in Tasmania?
It depends on the work. Structural changes and new plumbing usually need sign-off before they start. Hadyn will tell you what your job needs when he sees it.
Tell us about the job
A few lines is enough to start. You get a call back from Hadyn, not a brochure, and nothing here goes on a mailing list.
The form is read between site visits, usually the same day. If you want an answer sooner, ring instead.
0438 380 710Thinking about building?
Ring Hadyn and talk it through. You get a straight answer on whether it is worth doing, and how it will be priced.
